Anno 2205

Anno 2205

4,998
198
Anno 2205
DragoKhan

DragoKhan

1,040
71
02 Feb 18
47h 6m
36%
DragoKhan

Bridge Day achievement in Anno 2205

Bridge Day

Finish a bridge construction project.

Bridge Day0
05 February 2018 - 1 guide
Hide ads

How to unlock the Bridge Day achievement

  • kwynnkwynn89,849
    22 Jan 2017 22 Jan 2017
    0 0 0
    Bridge projects can only be built on pre-determined locations. You can find them in the temperate regions Walbruck Basin, Viridian Coves, and Cape Amber.
  • Have you got any tips or tricks to unlock this achievement?
    Add a guide to share them with the community.

    Sign in and add a guide
Do you have a question about this achievement? Please post it in the Anno 2205 Forum